[email protected] +86 130 3760 0603 Erqi District, Zhengzhou, Henan, China
XBOILER

XBOILER Water Treatment Equipment

Boiler water should contain less than 5 ppm of hardness. Otherwise, the safety and economic operation of the boiler will be seriously affected. Therefore, a water softener should be installed in the boiler system. This reduces the hardness of the boiler feed water.

  • Sürecinize uygun kapasite ve yakıt
  • İhracat dokümantasyonu ve devreye alma desteği
  • Yedek parça ve satış sonrası hizmet

Teknik Özellikler

CapacityQuoted per project requirement
FuelBiomass / gas / oil / coal
Working pressure1.0–2.5 MPa
ApplicationIndustrial process steam or hot water
Efficiency≥ 92–98% depending on fuel, model and load
ControlPLC / automatic; remote monitoring optional
DocumentationGeneral arrangement drawing, material certificates, O&M manual
Lead time20–45 days after drawing approval
Warranty12–60 months depending on scope

Özellikler ihtiyaca göre özelleştirilebilir. Tam teknik veriler ve çizimler için bize ulaşın.

Uygulamalar

  • Gıda ve içecek sektörü
  • Palm yağı fabrikaları ve biyokütle işleme
  • Tekstil, kauçuk ve plastik
  • Kimya, ilaç ve kağıt

Açıklama

System Diagram

XBOILER boiler equipment

Product Advantage

  1. Water with a hardness of less than 5 ppm should be used for the boiler. Otherwise, it will have a serious impact on the boiler’s safety and economic operation (e.g. causing metal corrosion, overheating of the water pipe during scaling, pipe breakage, etc.).
  2. Currently, water treatment outside the boiler is used (e.g. ion exchange and lime treatment), whereas water treatment inside the boiler involves adding sodium salt.
  3. The XBOILER mainly uses the XBOILER Water Treatment Equipment method involving ion exchange resin, which can be recycled to extend the product’s service life and reduce costs. 1-year warranty. After-sales support for life!

Compared with other options

Typical differences between XBOILER equipment and a general-market alternative.

FeatureXBOILERGeneral market
Build & inspectionZhengzhou boiler manufacturing base, third-party inspection on every unitPure trading company, no engineering team
Efficiency on siteOptimised combustion, low excess air, tested at commissioningNameplate figure only
DocumentationDrawings, material certificates, O&M manualLimited or on request
After-salesSpare parts and engineer support, remote diagnosisVaries, often no local stock
CustomisationFuel, pressure, voltage and layout adaptedFixed catalogue models

Sorular

Kapasite özelleştirilebilir mi?

Evet. Kapasite, basınç ve yakıt süreç gereksinimlerinize göre belirlenir.

Teslim süresi nedir?

Genellikle çizim onayından sonra 30-60 iş günü.

Kurulum dahil mi?

Kurulum denetimi, devreye alma ve operatör eğitimi sağlıyoruz.

Teklif İsteyin

Verilerinizi gönderin, teknik ekibimiz ihtiyacınıza göre teklif hazırlasın.

We reply within one working day. Your details are used only to answer this enquiry.

WhatsApp’ta sohbet edin
WhatsApp Email Talep
XBOILER COMPANY
XBOILER COMPANY
Erqi District, Zhengzhou, Henan, China
WhatsApp +86 130 3760 0603 · [email protected]
https://www.xboiler.com/
XBOILER Water Treatment Equipment
2026-11-27 · XBOILER COMPANY · https://www.xboiler.com/