[email protected] +86 130 3760 0603 Erqi District, Zhengzhou, Henan, China
XBOILER

XBOILER Water Treatment Equipment

Boiler water should contain less than 5 ppm of hardness. Otherwise, the safety and economic operation of the boiler will be seriously affected. Therefore, a water softener should be installed in the boiler system. This reduces the hardness of the boiler feed water.

  • سعة ونوع وقود مصمّمان لعملية الإنتاج لديكم
  • وثائق التصدير ودعم التشغيل التجريبي
  • قطع الغيار وخدمة ما بعد البيع

المواصفات

CapacityQuoted per project requirement
FuelBiomass / gas / oil / coal
Working pressure1.0–2.5 MPa
ApplicationIndustrial process steam or hot water
Efficiency≥ 92–98% depending on fuel, model and load
ControlPLC / automatic; remote monitoring optional
DocumentationGeneral arrangement drawing, material certificates, O&M manual
Lead time20–45 days after drawing approval
Warranty12–60 months depending on scope

يمكن تخصيص المواصفات. اتصل بنا للحصول على البيانات الفنية الكاملة والمخططات.

التطبيقات

  • صناعة الأغذية والمشروبات
  • مصافي زيت النخيل ومعالجة الكتلة الحيوية
  • النسيج والمطاط والبلاستيك
  • الكيماويات والأدوية والورق

الوصف

System Diagram

XBOILER boiler equipment

Product Advantage

  1. Water with a hardness of less than 5 ppm should be used for the boiler. Otherwise, it will have a serious impact on the boiler’s safety and economic operation (e.g. causing metal corrosion, overheating of the water pipe during scaling, pipe breakage, etc.).
  2. Currently, water treatment outside the boiler is used (e.g. ion exchange and lime treatment), whereas water treatment inside the boiler involves adding sodium salt.
  3. The XBOILER mainly uses the XBOILER Water Treatment Equipment method involving ion exchange resin, which can be recycled to extend the product’s service life and reduce costs. 1-year warranty. After-sales support for life!

Compared with other options

Typical differences between XBOILER equipment and a general-market alternative.

FeatureXBOILERGeneral market
Build & inspectionZhengzhou boiler manufacturing base, third-party inspection on every unitPure trading company, no engineering team
Efficiency on siteOptimised combustion, low excess air, tested at commissioningNameplate figure only
DocumentationDrawings, material certificates, O&M manualLimited or on request
After-salesSpare parts and engineer support, remote diagnosisVaries, often no local stock
CustomisationFuel, pressure, voltage and layout adaptedFixed catalogue models

أسئلة

هل يمكن تخصيص السعة؟

نعم. تُطابق السعة والضغط والوقود مع متطلبات عمليتكم.

ما مدة التسليم؟

عادةً 30–60 يوم عمل بعد اعتماد المخططات.

هل التركيب مشمول؟

نوفر الإشراف على التركيب والتشغيل التجريبي وتدريب المشغّلين.

اطلب عرض سعر

أرسل بياناتكم وسيُعدّ فريقنا الفني عرضًا وفق متطلباتكم.

We reply within one working day. Your details are used only to answer this enquiry.

تحدث عبر واتساب
WhatsApp Email استفسار
XBOILER COMPANY
XBOILER COMPANY
Erqi District, Zhengzhou, Henan, China
WhatsApp +86 130 3760 0603 · [email protected]
https://www.xboiler.com/
XBOILER Water Treatment Equipment
2026-11-27 · XBOILER COMPANY · https://www.xboiler.com/