





Boiler water should contain less than 5 ppm of hardness. Otherwise, the safety and economic operation of the boiler will be seriously affected. Therefore, a water softener should be installed in the boiler system. This reduces the hardness of the boiler feed water.
- سعة ونوع وقود مصمّمان لعملية الإنتاج لديكم
- وثائق التصدير ودعم التشغيل التجريبي
- قطع الغيار وخدمة ما بعد البيع
المواصفات
| Capacity | Quoted per project requirement |
|---|---|
| Fuel | Biomass / gas / oil / coal |
| Working pressure | 1.0–2.5 MPa |
| Application | Industrial process steam or hot water |
| Efficiency | ≥ 92–98% depending on fuel, model and load |
| Control | PLC / automatic; remote monitoring optional |
| Documentation | General arrangement drawing, material certificates, O&M manual |
| Lead time | 20–45 days after drawing approval |
| Warranty | 12–60 months depending on scope |
يمكن تخصيص المواصفات. اتصل بنا للحصول على البيانات الفنية الكاملة والمخططات.
التطبيقات
- صناعة الأغذية والمشروبات
- مصافي زيت النخيل ومعالجة الكتلة الحيوية
- النسيج والمطاط والبلاستيك
- الكيماويات والأدوية والورق
الوصف
System Diagram

Product Advantage
- Water with a hardness of less than 5 ppm should be used for the boiler. Otherwise, it will have a serious impact on the boiler’s safety and economic operation (e.g. causing metal corrosion, overheating of the water pipe during scaling, pipe breakage, etc.).
- Currently, water treatment outside the boiler is used (e.g. ion exchange and lime treatment), whereas water treatment inside the boiler involves adding sodium salt.
- The XBOILER mainly uses the XBOILER Water Treatment Equipment method involving ion exchange resin, which can be recycled to extend the product’s service life and reduce costs. 1-year warranty. After-sales support for life!
Compared with other options
Typical differences between XBOILER equipment and a general-market alternative.
| Feature | XBOILER | General market |
|---|---|---|
| Build & inspection | Zhengzhou boiler manufacturing base, third-party inspection on every unit | Pure trading company, no engineering team |
| Efficiency on site | Optimised combustion, low excess air, tested at commissioning | Nameplate figure only |
| Documentation | Drawings, material certificates, O&M manual | Limited or on request |
| After-sales | Spare parts and engineer support, remote diagnosis | Varies, often no local stock |
| Customisation | Fuel, pressure, voltage and layout adapted | Fixed catalogue models |
Further reading
أسئلة
هل يمكن تخصيص السعة؟
نعم. تُطابق السعة والضغط والوقود مع متطلبات عمليتكم.
ما مدة التسليم؟
عادةً 30–60 يوم عمل بعد اعتماد المخططات.
هل التركيب مشمول؟
نوفر الإشراف على التركيب والتشغيل التجريبي وتدريب المشغّلين.
اطلب عرض سعر
أرسل بياناتكم وسيُعدّ فريقنا الفني عرضًا وفق متطلباتكم.