XBOILER's dedicated wet dust collector for EPCB boilers effectively captures both liquid and solid particles (0.1–20 μm diameter) and certain gaseous contaminants from airflow. This targeted solution achieves filtration efficiency exceeding 85%.
- Capacidade e combustível adaptados ao seu processo
- Documentação de exportação e suporte de comissionamento
- Peças de reposição e serviço pós-venda
Especificação
| Capacity | Quoted per project requirement |
|---|---|
| Fuel | Biomass / gas / oil / coal |
| Working pressure | 1.0–2.5 MPa |
| Application | Industrial process steam or hot water |
| Efficiency | ≥ 92–98% depending on fuel, model and load |
| Control | PLC / automatic; remote monitoring optional |
| Documentation | General arrangement drawing, material certificates, O&M manual |
| Lead time | 20–45 days after drawing approval |
| Warranty | 12–60 months depending on scope |
As especificações podem ser personalizadas. Fale conosco para dados técnicos completos e desenhos.
Aplicações
- Indústria de alimentos e bebidas
- Usinas de óleo de palma e processamento de biomassa
- Têxtil, borracha e plásticos
- Química, farmacêutica e papel
Descrição
System Diagram

Product Advantage
1.Efficient Workflow:
Dust-laden gas is forced through a water bath in our specialized tank via high-pressure centrifugal suction. Initial dust absorption occurs as water traps particulates. Gas then rises uniformly while high-pressure nozzles shower downward water mist, capturing residual particles in a counter-flow purification process.
2.Superior Dust Removal:
XBOILER’s dedicated wet dust collector for XBOILER boilers removes 85%+ of liquid/solid particles (0.1–20 μm) and select gaseous pollutants from airflow, ensuring compliant emissions control.
3.Robust Construction:
Engineered with corrosion-resistant, high-grade fiberglass for durability. Features compact footprint, simplified installation, operational cost savings, and optimized dust capture performance.
4.Unmatched Support:
Backed by a 1-year warranty, lifetime after-sales service, and 24/7 expert support. XBOILER engineers provide immediate solutions to operational challenges.
Compared with other options
Typical differences between XBOILER equipment and a general-market alternative.
| Feature | XBOILER | General market |
|---|---|---|
| Build & inspection | Zhengzhou boiler manufacturing base, third-party inspection on every unit | Pure trading company, no engineering team |
| Efficiency on site | Optimised combustion, low excess air, tested at commissioning | Nameplate figure only |
| Documentation | Drawings, material certificates, O&M manual | Limited or on request |
| After-sales | Spare parts and engineer support, remote diagnosis | Varies, often no local stock |
| Customisation | Fuel, pressure, voltage and layout adapted | Fixed catalogue models |
Further reading
Perguntas
A capacidade pode ser personalizada?
Sim. Capacidade, pressão e combustível são ajustados aos requisitos do seu processo.
Qual é o prazo de entrega?
Normalmente de 30 a 60 dias úteis após a aprovação dos desenhos.
A instalação está incluída?
Fornecemos supervisão de instalação, comissionamento e treinamento de operadores.
Solicitar orçamento
Envie seus dados e nossa equipe técnica preparará uma proposta conforme sua necessidade.