[email protected] +86 130 3760 0603 Erqi District, Zhengzhou, Henan, China
XBOILER

XBOILER's dedicated wet dust collector for EPCB boilers effectively captures both liquid and solid particles (0.1–20 μm diameter) and certain gaseous contaminants from airflow. This targeted solution achieves filtration efficiency exceeding 85%.

  • سعة ونوع وقود مصمّمان لعملية الإنتاج لديكم
  • وثائق التصدير ودعم التشغيل التجريبي
  • قطع الغيار وخدمة ما بعد البيع

المواصفات

CapacityQuoted per project requirement
FuelBiomass / gas / oil / coal
Working pressure1.0–2.5 MPa
ApplicationIndustrial process steam or hot water
Efficiency≥ 92–98% depending on fuel, model and load
ControlPLC / automatic; remote monitoring optional
DocumentationGeneral arrangement drawing, material certificates, O&M manual
Lead time20–45 days after drawing approval
Warranty12–60 months depending on scope

يمكن تخصيص المواصفات. اتصل بنا للحصول على البيانات الفنية الكاملة والمخططات.

التطبيقات

  • صناعة الأغذية والمشروبات
  • مصافي زيت النخيل ومعالجة الكتلة الحيوية
  • النسيج والمطاط والبلاستيك
  • الكيماويات والأدوية والورق

الوصف

System Diagram

XBOILER boiler equipment

Product Advantage

1.Efficient Workflow:
Dust-laden gas is forced through a water bath in our specialized tank via high-pressure centrifugal suction. Initial dust absorption occurs as water traps particulates. Gas then rises uniformly while high-pressure nozzles shower downward water mist, capturing residual particles in a counter-flow purification process.
2.Superior Dust Removal:
XBOILER’s dedicated wet dust collector for XBOILER boilers removes 85%+ of liquid/solid particles (0.1–20 μm) and select gaseous pollutants from airflow, ensuring compliant emissions control.
3.Robust Construction:
Engineered with corrosion-resistant, high-grade fiberglass for durability. Features compact footprint, simplified installation, operational cost savings, and optimized dust capture performance.
4.Unmatched Support:
Backed by a 1-year warranty, lifetime after-sales service, and 24/7 expert support. XBOILER engineers provide immediate solutions to operational challenges.

Compared with other options

Typical differences between XBOILER equipment and a general-market alternative.

FeatureXBOILERGeneral market
Build & inspectionZhengzhou boiler manufacturing base, third-party inspection on every unitPure trading company, no engineering team
Efficiency on siteOptimised combustion, low excess air, tested at commissioningNameplate figure only
DocumentationDrawings, material certificates, O&M manualLimited or on request
After-salesSpare parts and engineer support, remote diagnosisVaries, often no local stock
CustomisationFuel, pressure, voltage and layout adaptedFixed catalogue models

أسئلة

هل يمكن تخصيص السعة؟

نعم. تُطابق السعة والضغط والوقود مع متطلبات عمليتكم.

ما مدة التسليم؟

عادةً 30–60 يوم عمل بعد اعتماد المخططات.

هل التركيب مشمول؟

نوفر الإشراف على التركيب والتشغيل التجريبي وتدريب المشغّلين.

اطلب عرض سعر

أرسل بياناتكم وسيُعدّ فريقنا الفني عرضًا وفق متطلباتكم.

We reply within one working day. Your details are used only to answer this enquiry.

تحدث عبر واتساب
WhatsApp Email استفسار
XBOILER COMPANY
XBOILER COMPANY
Erqi District, Zhengzhou, Henan, China
WhatsApp +86 130 3760 0603 · [email protected]
https://www.xboiler.com/
XBOILER Wet Dust Collector
2026-11-27 · XBOILER COMPANY · https://www.xboiler.com/