





Boiler water should contain less than 5 ppm of hardness. Otherwise, the safety and economic operation of the boiler will be seriously affected. Therefore, a water softener should be installed in the boiler system. This reduces the hardness of the boiler feed water.
- Capacity and fuel type tailored to your process
- Export documentation and commissioning support
- Spare parts and after-sales service
Specification
| Capacity | Quoted per project requirement |
|---|---|
| Fuel | Biomass / gas / oil / coal |
| Working pressure | 1.0–2.5 MPa |
| Application | Industrial process steam or hot water |
| Efficiency | ≥ 92–98% depending on fuel, model and load |
| Control | PLC / automatic; remote monitoring optional |
| Documentation | General arrangement drawing, material certificates, O&M manual |
| Lead time | 20–45 days after drawing approval |
| Warranty | 12–60 months depending on scope |
Specifications can be customised. Contact us for full technical data and drawings.
Applications
- Food and beverage industry
- Palm oil mills and biomass processing
- Textile, rubber and plastics
- Chemical, pharmaceutical and paper
Description
System Diagram

Product Advantage
- Water with a hardness of less than 5 ppm should be used for the boiler. Otherwise, it will have a serious impact on the boiler’s safety and economic operation (e.g. causing metal corrosion, overheating of the water pipe during scaling, pipe breakage, etc.).
- Currently, water treatment outside the boiler is used (e.g. ion exchange and lime treatment), whereas water treatment inside the boiler involves adding sodium salt.
- The XBOILER mainly uses the XBOILER Water Treatment Equipment method involving ion exchange resin, which can be recycled to extend the product’s service life and reduce costs. 1-year warranty. After-sales support for life!
Compared with other options
Typical differences between XBOILER equipment and a general-market alternative.
| Feature | XBOILER | General market |
|---|---|---|
| Build & inspection | Zhengzhou boiler manufacturing base, third-party inspection on every unit | Pure trading company, no engineering team |
| Efficiency on site | Optimised combustion, low excess air, tested at commissioning | Nameplate figure only |
| Documentation | Drawings, material certificates, O&M manual | Limited or on request |
| After-sales | Spare parts and engineer support, remote diagnosis | Varies, often no local stock |
| Customisation | Fuel, pressure, voltage and layout adapted | Fixed catalogue models |
Further reading
Questions
Can the capacity be customised?
Yes. Capacity, pressure and fuel are matched to your process requirements.
What is the delivery time?
Typically 30-60 working days after drawing approval.
Is installation included?
We provide installation supervision, commissioning and operator training.
Request a Quotation
Send us your data and our technical team will prepare a proposal for your requirements.


