





This is a new generation of high-efficiency, self-priming, vertical, multi-stage, centrifugal pump that has been independently developed in accordance with the latest European standards.
- Capacidade e combustível adaptados ao seu processo
- Documentação de exportação e suporte de comissionamento
- Peças de reposição e serviço pós-venda
Especificação
| Capacity | Quoted per project requirement |
|---|---|
| Fuel | Biomass / gas / oil / coal |
| Working pressure | 1.0–2.5 MPa |
| Application | Industrial process steam or hot water |
| Efficiency | ≥ 92–98% depending on fuel, model and load |
| Control | PLC / automatic; remote monitoring optional |
| Documentation | General arrangement drawing, material certificates, O&M manual |
| Lead time | 20–45 days after drawing approval |
| Warranty | 12–60 months depending on scope |
As especificações podem ser personalizadas. Fale conosco para dados técnicos completos e desenhos.
Aplicações
- Indústria de alimentos e bebidas
- Usinas de óleo de palma e processamento de biomassa
- Têxtil, borracha e plásticos
- Química, farmacêutica e papel
Descrição
System Diagram

Product Advantages
1.This is a new generation of high-efficiency, self-priming, vertical, multi-stage, centrifugal pump that has been independently developed in accordance with the latest European standards.
- The energy efficiency index reaches MEI ≥ 0.7. It is energy-efficient, quiet, environmentally friendly, compactly structured, aesthetically pleasing, lightweight, easy to use and maintain, and highly reliable.
- It can transport various media, including tap water and various industrial liquids. It can adapt to different temperatures, flows and pressures.
- It is safe and stable, providing water for the boiler and effectively improving its working efficiency, saving you money.
- It comes with a 1-year warranty and 24-hour online customer service, with experienced technical personnel available to answer customer questions online. Buy with peace of mind and use with ease.
Compared with other options
Typical differences between XBOILER equipment and a general-market alternative.
| Feature | XBOILER | General market |
|---|---|---|
| Build & inspection | Zhengzhou boiler manufacturing base, third-party inspection on every unit | Pure trading company, no engineering team |
| Efficiency on site | Optimised combustion, low excess air, tested at commissioning | Nameplate figure only |
| Documentation | Drawings, material certificates, O&M manual | Limited or on request |
| After-sales | Spare parts and engineer support, remote diagnosis | Varies, often no local stock |
| Customisation | Fuel, pressure, voltage and layout adapted | Fixed catalogue models |
Further reading
Perguntas
A capacidade pode ser personalizada?
Sim. Capacidade, pressão e combustível são ajustados aos requisitos do seu processo.
Qual é o prazo de entrega?
Normalmente de 30 a 60 dias úteis após a aprovação dos desenhos.
A instalação está incluída?
Fornecemos supervisão de instalação, comissionamento e treinamento de operadores.
Solicitar orçamento
Envie seus dados e nossa equipe técnica preparará uma proposta conforme sua necessidade.