[email protected] +86 130 3760 0603 Erqi District, Zhengzhou, Henan, China
XBOILER

Material, carbon steel, stainless steel, FRP, etc. Thickness: 0.2 ~ 13mm Height: 20 ~ 45m Application: oil gas fired boiler, coal-fired boiler, biomass fired boiler, etc.

  • Capacidade e combustível adaptados ao seu processo
  • Documentação de exportação e suporte de comissionamento
  • Peças de reposição e serviço pós-venda

Especificação

Thickness0.2 ~ 13mm
Height20 ~ 45m
Applicationoil gas fired boiler, coal-fired boiler, biomass fired boiler, etc.
Efficiency≥ 92–98% depending on fuel, model and load
ControlPLC / automatic; remote monitoring optional
DocumentationGeneral arrangement drawing, material certificates, O&M manual
Lead time20–45 days after drawing approval
Warranty12–60 months depending on scope

As especificações podem ser personalizadas. Fale conosco para dados técnicos completos e desenhos.

Aplicações

  • Indústria de alimentos e bebidas
  • Usinas de óleo de palma e processamento de biomassa
  • Têxtil, borracha e plásticos
  • Química, farmacêutica e papel

Descrição

System Diagram

XBOILER boiler equipment

Product Advantage

1.Premium Materials:

The XBOILER chimney is crafted from high-quality steel with a corrosion-resistant coating, significantly reducing corrosion and extending its lifespan.

2.Simple Installation:

Featuring a modular, multi-section design, the XBOILER chimney ensures easy transportation and hassle-free installation.

3.Advanced Design Standards:

Designed to meet stringent chimney requirements, it incorporates innovative features to elevate quality while adhering to industry standards.

4.Optimized Height:

The XBOILER chimney is tailored to complement the boiler system, meeting regulatory standards while minimizing installation costs.

6.Cost-Effective Solution:

Customized inner diameters are matched to the boiler’s fuel type and output, optimizing performance and reducing expenses.

Compared with other options

Typical differences between XBOILER equipment and a general-market alternative.

FeatureXBOILERGeneral market
Build & inspectionZhengzhou boiler manufacturing base, third-party inspection on every unitPure trading company, no engineering team
Efficiency on siteOptimised combustion, low excess air, tested at commissioningNameplate figure only
DocumentationDrawings, material certificates, O&M manualLimited or on request
After-salesSpare parts and engineer support, remote diagnosisVaries, often no local stock
CustomisationFuel, pressure, voltage and layout adaptedFixed catalogue models

Perguntas

A capacidade pode ser personalizada?

Sim. Capacidade, pressão e combustível são ajustados aos requisitos do seu processo.

Qual é o prazo de entrega?

Normalmente de 30 a 60 dias úteis após a aprovação dos desenhos.

A instalação está incluída?

Fornecemos supervisão de instalação, comissionamento e treinamento de operadores.

Solicitar orçamento

Envie seus dados e nossa equipe técnica preparará uma proposta conforme sua necessidade.

We reply within one working day. Your details are used only to answer this enquiry.

Falar no WhatsApp
WhatsApp Email Consulta
XBOILER COMPANY
XBOILER COMPANY
Erqi District, Zhengzhou, Henan, China
WhatsApp +86 130 3760 0603 · [email protected]
https://www.xboiler.com/
XBOILER Chimney
2026-11-27 · XBOILER COMPANY · https://www.xboiler.com/