[email protected] +86 130 3760 0603 Erqi District, Zhengzhou, Henan, China
XBOILER

XBOILER Economizer

The economizer utilizes boiler exhaust gas to preheat the feed water, saving fuel. XBOILER offers various economizers, tailored to users' specific needs.

  • Capacity and fuel type tailored to your process
  • Export documentation and commissioning support
  • Spare parts and after-sales service

Specification

CapacityQuoted per project requirement
FuelBiomass / gas / oil / coal
Working pressure1.0–2.5 MPa
ApplicationIndustrial process steam or hot water
Efficiency≥ 92–98% depending on fuel, model and load
ControlPLC / automatic; remote monitoring optional
DocumentationGeneral arrangement drawing, material certificates, O&M manual
Lead time20–45 days after drawing approval
Warranty12–60 months depending on scope

Specifications can be customised. Contact us for full technical data and drawings.

Applications

  • Food and beverage industry
  • Palm oil mills and biomass processing
  • Textile, rubber and plastics
  • Chemical, pharmaceutical and paper

Description

System Diagram

XBOILER boiler equipment

Product Advantage

  1. XBOILER economizers are crafted from ND steel and other pressure vessel steels, offering robust corrosion resistance and stability, with a typical lifespan exceeding 8 years.
  2. Featuring a fin tube design with optimized segment spacing, XBOILER economizers enhance the heating surface area, efficiently recovering heat from flue gas.
  3. By raising the boiler feed water temperature, XBOILER economizers minimize the temperature gap between feed water and boiler water, reducing thermal stress and prolonging boiler lifespan.
  4. Installing an XBOILER economizer can save businesses 3–5% on fuel costs, helping enterprises reduce expenses.
  5. XBOILER provides complimentary technical consultation, evaluation, and customized boiler solutions.

Compared with other options

Typical differences between XBOILER equipment and a general-market alternative.

FeatureXBOILERGeneral market
Build & inspectionZhengzhou boiler manufacturing base, third-party inspection on every unitPure trading company, no engineering team
Efficiency on siteOptimised combustion, low excess air, tested at commissioningNameplate figure only
DocumentationDrawings, material certificates, O&M manualLimited or on request
After-salesSpare parts and engineer support, remote diagnosisVaries, often no local stock
CustomisationFuel, pressure, voltage and layout adaptedFixed catalogue models

Questions

Can the capacity be customised?

Yes. Capacity, pressure and fuel are matched to your process requirements.

What is the delivery time?

Typically 30-60 working days after drawing approval.

Is installation included?

We provide installation supervision, commissioning and operator training.

Request a Quotation

Send us your data and our technical team will prepare a proposal for your requirements.

We reply within one working day. Your details are used only to answer this enquiry.

Chat on WhatsApp
WhatsApp Email Inquiry
XBOILER COMPANY
XBOILER COMPANY
Erqi District, Zhengzhou, Henan, China
WhatsApp +86 130 3760 0603 · [email protected]
https://www.xboiler.com/
XBOILER Economizer
2026-11-27 · XBOILER COMPANY · https://www.xboiler.com/