




Structure: Water Tube Steam Boiler Capacity: 4~20T/h Pressure: 1.25~ 2.5 M Pa Fuel: Any solid fuel you want to use. Application: Textile factory.
- Capacity and fuel type tailored to your process
- Export documentation and commissioning support
- Spare parts and after-sales service
Specification
| Structure | Water Tube Steam Boiler |
|---|---|
| Capacity | 4~20T/h |
| Pressure | 1.25~ 2.5 M Pa |
| Fuel | Any solid fuel you want to use. |
| Application | Textile factory. |
| Efficiency | ≥ 92–98% depending on fuel, model and load |
| Control | PLC / automatic; remote monitoring optional |
| Documentation | General arrangement drawing, material certificates, O&M manual |
| Lead time | 20–45 days after drawing approval |
| Warranty | 12–60 months depending on scope |
Specifications can be customised. Contact us for full technical data and drawings.
Applications
- Food and beverage industry
- Palm oil mills and biomass processing
- Textile, rubber and plastics
- Chemical, pharmaceutical and paper
Description
XBOILER Product Advantages
![]() |
Advanced Water Wall Design XBOILER’s chain grate boiler is designed to save fuel and reduce costs. Our advanced design ensures more complete fuel combustion. The grate air ducts are evenly arranged, allowing adjustable wind speeds tailored to fuel conditions. This provides optimal air and fuel mixing for 100% combustion efficiency, preventing excess air from carrying away valuable heat. |
![]() |
Versatile Chain Grate System XBOILER offers flexible electric control configurations with multiple interlocking protections. Choose from a user-friendly, durable button-type control box or an advanced PLC touch screen for intelligent control. The PLC interface directly displays combustion conditions, simplifying operation and monitoring. |
![]() |
Auxiliary for Textile Mills Equipped with a high-efficiency economizer and dust collector, XBOILER recovers flue gas heat, lowers exhaust temperatures, and boosts thermal efficiency. Our systems ensure compliance with national environmental protection standards, minimizing pollutant emissions. |
![]() |
Intelligent Control System XBOILER includes advanced dust collector equipment(Bag Type/ Multi Tube/ Wet Dust collector), ensuring that emissions meet stringent national environmental protection requirements, maintaining clean and compliant operations. |
![]() |
Premium Valves and Instruments XBOILER uses superior insulation and refractory materials to enhance energy efficiency. These materials ensure that high-temperature flue gas exchanges heat solely with the boiler water, not the surrounding air. Additionally, our water pipes are protected from high-temperature flue gas, preventing burnouts and extending boiler lifespan. |
Technical Parameters
Find the capacity of the coal fired steam boiler you want and check other parameters of the boiler as a reference.
| Item/Type | Easy to Operate Chain Grate Boiler for Sale | |||||||||
| Rated capacity t/h | 1 | 2 | 4 | 6 | 8 | 10 | 12 | 15 | 20 | |
| Rated steam pressure MPa | 0.7/1.25 | 0.7/1.25/1.6 | 1.25/1.6 | 1.25/1.6 | 1.25/1.6 | 1.25/1.6 | 1.25/1.6 | 1.25/1.6 | 1.25/1.6 | |
| Rated steam temperature ℃ | 170/194 | 170/194/204 | 194/204 | 194/204 | 194/204 | 194/204 | 194/204 | 194/204 | 194/204 | |
| Feed water temperature ℃ | 20 | |||||||||
| Boiler thermal efficiency % | 78.1 | 80.2 | 82.3 | 82.5 | 82.5 | 82.9 | 82.9 | 83.1 | 83.1 | |
| Body heating area m2 | 22.99 | 48.7 | 96.34 | 148.15 | 174.4 | 226.2 | 276 | 374.5 | 669 | |
| Fuel & consumption | Fuel type | Class II Soft Coal, Biomass, Wood Chips, Wood Pellets, Rice Husk, Palm Kernel Shell, etc. |
||||||||
| Coal kg/h | 118.76 | 231.30 | 450.79 | 674.54 | 899.39 | 1118.81 | 1342.57 | 1674.18 | 2232.23 | |
| Biomass kg/h | 171.63 | 334.27 | 651.48 | 974.85 | 1299.81 | 1616.92 | 1940.30 | 2419.54 | 3226.05 | |
| Size of boiler largest parts mm |
Length | 4600 | 5800 | 6700 | 7000 | 7300 | 7600 | 7600 | 8500 | 9500 |
| Width | 1900 | 2600 | 2700 | 3000 | 3000 | 3200 | 3200 | 3400 | 3800 | |
| Height | 2900 | 3500 | 3500 | 3500 | 3500 | 3500 | 3500 | 3500 | 7100 | |
| Weight of boiler largest parts ton |
18 | 22 | 30.1 | 40 | 21/14 | 23/17 | 23/19 | 21/24 | 25/24 | |
Document Supply
| No. | Item | Example/Issuer | Qty | Unit |
| 1 | Boiler Drawings | General Drawing, Boiler Proper Drawing, PID (Pipes, Instruments & Valves) Drawing, Foundation Drawing, Boiler Room Design Drawing. | 1 | Set |
| 2 | Boiler Quality Certificate | Issued by the boiler inspection department of China government. | 1 | Set |
| 3 | Certificate of Origin | Such as CO, Form E, Form F, Form A, etc. | 1 | Set |
| 4 | Boiler Thermodynamic Calculation Book | Issued by the boiler supplier. | 1 | Set |
| 5 | Boiler Strength Calculation Book | Issued by the boiler supplier. | 1 | Set |
| 6 | Installation & Operation Instruction | Issued by the boiler supplier. | 1 | Set |
Compared with other options
Typical differences between XBOILER equipment and a general-market alternative.
| Feature | XBOILER | General market |
|---|---|---|
| Build & inspection | Zhengzhou boiler manufacturing base, third-party inspection on every unit | Pure trading company, no engineering team |
| Efficiency on site | Optimised combustion, low excess air, tested at commissioning | Nameplate figure only |
| Documentation | Drawings, material certificates, O&M manual | Limited or on request |
| After-sales | Spare parts and engineer support, remote diagnosis | Varies, often no local stock |
| Customisation | Fuel, pressure, voltage and layout adapted | Fixed catalogue models |
Further reading
Questions
Can the capacity be customised?
Yes. Capacity, pressure and fuel are matched to your process requirements.
What is the delivery time?
Typically 30-60 working days after drawing approval.
Is installation included?
We provide installation supervision, commissioning and operator training.
Request a Quotation
Send us your data and our technical team will prepare a proposal for your requirements.







