




To monitor the water level in a steam boiler at any time, a water level gauge is installed on the boiler. The water level gauge and the boiler are connected. Users can read the water level on the gauge to determine the volume of water in the boiler.
- Capacidad y combustible adaptados a su proceso
- Documentación de exportación y soporte de puesta en marcha
- Repuestos y servicio posventa
Especificación
| Capacity | Quoted per project requirement |
|---|---|
| Fuel | Biomass / gas / oil / coal |
| Working pressure | 1.0–2.5 MPa |
| Application | Industrial process steam or hot water |
| Efficiency | ≥ 92–98% depending on fuel, model and load |
| Control | PLC / automatic; remote monitoring optional |
| Documentation | General arrangement drawing, material certificates, O&M manual |
| Lead time | 20–45 days after drawing approval |
| Warranty | 12–60 months depending on scope |
Las especificaciones se pueden personalizar. Contáctenos para datos técnicos completos y planos.
Aplicaciones
- Industria alimentaria y de bebidas
- Plantas de aceite de palma y procesamiento de biomasa
- Textil, caucho y plásticos
- Química, farmacéutica y papel
Descripción
System Diagram

Product Advantage
- To monitor the water level in the steam boiler at any time, a water level gauge is installed on the boiler. The water level gauge and the boiler are connected.
- The four most common types of water level gauge are the glass tube type, the flat type, the two-colour water level gauge and the low position water level meter. We will provide a suitable water level gauge according to the user’s requirements.
- All XBOILER water level gauges are from China’s famous brands and are of a high quality. They are sold at ex-factory prices with a 1-year quality assurance. Any quality problems will be resolved promptly.
Compared with other options
Typical differences between XBOILER equipment and a general-market alternative.
| Feature | XBOILER | General market |
|---|---|---|
| Build & inspection | Zhengzhou boiler manufacturing base, third-party inspection on every unit | Pure trading company, no engineering team |
| Efficiency on site | Optimised combustion, low excess air, tested at commissioning | Nameplate figure only |
| Documentation | Drawings, material certificates, O&M manual | Limited or on request |
| After-sales | Spare parts and engineer support, remote diagnosis | Varies, often no local stock |
| Customisation | Fuel, pressure, voltage and layout adapted | Fixed catalogue models |
Further reading
Preguntas
¿Se puede personalizar la capacidad?
Sí. La capacidad, la presión y el combustible se ajustan a los requisitos de su proceso.
¿Cuál es el plazo de entrega?
Normalmente de 30 a 60 días hábiles tras la aprobación de los planos.
¿La instalación está incluida?
Ofrecemos supervisión de instalación, puesta en marcha y formación de operadores.
Solicitar cotización
Envíenos sus datos y nuestro equipo técnico preparará una propuesta según sus requisitos.