A dual fuel burner is not two burners sharing a housing. It is one combustion system with two fuel trains, a programmed changeover sequence and a single set of safety interlocks that must remain valid in both modes. Packaged boilers from XBOILER COMPANY are frequently ordered with gas as the primary fuel and light oil as backup, usually because the gas supply is interruptible or because the site must guarantee steam during a network curtailment. Getting that arrangement right depends on more than the burner head.

What dual fuel means on a packaged boiler

In gas mode the burner fires through a gas spud or a ring of nozzles; in oil mode a pressure-jet nozzle, sometimes with compressed air atomisation, fires through the centre. Both sit in the same throat and share the combustion air fan, swirl plate and flame scanner. The burner management system holds two parameter sets – firing curves, damper positions, oxygen targets – and switches between them, never blending the two fuels in normal operation. Capacity is usually quoted for gas and then de-rated by 5 to 15% in oil mode, because the oil flame is longer and furnace volume limits it.

  • Steam capacity range: 0.5 to 20 t/h, or 0.35 to 14 MW hot water.
  • Gas pressure at the train outlet: 20 to 50 mbar for natural gas.
  • Oil pressure at the nozzle: 10 to 25 bar for light oil.
  • Typical turndown: 3:1 on gas, 2.5:1 on oil.

The changeover hardware

Each fuel needs its own shut-off arrangement. The gas train carries a filter, regulator, two safety shut-off valves with a vent valve between them, a leak test port, low and high pressure switches and a flow measuring orifice. The oil train carries a strainer, a pump set with relief valve, a pressure regulating valve, a heater if heavy oil is used, and two shut-off valves with a leak test point. Changeover is a programmed sequence: ramp down, close the active fuel valves, purge the furnace for five to ten combustion volume changes, prove the new train for pressure and tightness, ignite at low fire, then release to modulation. A full changeover takes three to eight minutes and is not something an operator should shortcut.

Turndown, firing rate and furnace fit

Turndown is set by flame stability, not by the fan. A gas flame holds stable to about 1:5 with a good swirl stabiliser and 1:8 with flue gas recirculation. A pressure-jet oil flame typically holds 1:3 to 1:4 before carbonisation or flame lift becomes a problem. If the plant expects long periods at 30% load on oil, specify a smaller oil nozzle and accept reduced maximum output, or use a return-flow atomiser which widens the range without sacrificing the top end.

Parameter Gas mode Light oil mode
Firing rate range 100% down to 20% 100% down to 30 to 35%
Oxygen at full load 3.0 to 4.0% 3.5 to 4.5%
Flue gas at boiler outlet 140 to 160 °C 150 to 175 °C
Uncontrolled NOx 80 to 120 mg/Nm3 120 to 180 mg/Nm3
Capacity against gas rating reference minus 5 to 15%

Combustion head and excess air

The combustion head has to work with two fuels whose stoichiometric air demand and flame speed differ. Natural gas needs about 9.5 Nm3 of air per Nm3 of gas at stoichiometric; light oil needs roughly 11.2 kg of air per kg of oil. The head is therefore set with a compromise swirl angle, and the gas nozzle ring is positioned so that gas jets do not disturb the oil spray cone. Excess air is trimmed separately for each curve. A common fault is commissioning on gas and copying the damper curve to oil: the result is either a smoky flame at low fire or 6% oxygen at high fire, and both cost fuel.

Control philosophy and changeover sequence

  1. Confirm the standby fuel is available: gas pressure within 20 to 50 mbar, or oil pressure and temperature at the nozzle.
  2. Ramp the burner to low fire and hold for 30 seconds.
  3. Close the active fuel safety valves and confirm closure by the downstream pressure switch.
  4. Purge at 25 to 100% air flow for the timer period required by the standard in force.
  5. Prove the new fuel train: leak test the double block and bleed, confirm pressure switches.
  6. Ignite at low fire, prove flame within the safety time, then release to modulation.

The sequence belongs in the burner management system, not in the operator’s head. Manual changeover with a keyswitch is acceptable only if the same steps are enforced by programmed permissives.

Sizing the two trains and the storage

Size the gas train for the maximum gas firing rate plus 10% margin, and check that the meter and regulator can pass that flow at the lowest expected supply pressure. On the oil side, a day tank of 1 to 2 m3 per 10 t/h of steam capacity covers typical backup runs; light oil at 40 °C and 10 to 25 bar atomising pressure gives a clean flame without preheating. If the backup is used only a few days a year, a fuel polishing and recirculation line keeps the oil from stagnating and absorbs any water that condenses in the tank.

XBOILER COMPANY supplies dual fuel packages with both trains factory-fitted and pressure-tested, which shortens site commissioning and keeps the interlocks consistent across the two modes. Ask for the changeover sequence and the leak test record with the documentation, not after the first gas curtailment.