Boiler capacity is usually quoted as a steam output in t/h, but that figure only becomes meaningful once it is matched to a measured load. A boiler selected from a guess will either run short during the morning start-up or spend its life at 30 percent output, where efficiency and control quality both fall away. The method below starts from the process, not from the boiler catalogue.
Step one: build the steam load from the process
Three approaches are used in practice, and the best studies use two of them to cross-check. The first is direct measurement with a vortex or orifice flow meter on the main steam header, logged over at least a full production week. The second is a condensate balance: measure condensate returned, then add flash and blowdown losses. The third is a heat balance on each consumer, using the latent heat at the working pressure:
m = Q / (h steam – h condensate)
For saturated steam at 8 bar(g) the enthalpy is about 2,770 kJ/kg, and condensate at 90 °C holds roughly 377 kJ/kg, so each kilogram delivers about 2,390 kJ. A jacketed kettle absorbing 500 kW therefore draws roughly 750 kg/h.
| Consumer | Typical steam rate | Load character |
|---|---|---|
| Jacketed kettle, 500 L | 300-700 kg/h | Batch, 40-60 min heat-up |
| Continuous blancher | 400-900 kg/h | Steady during production |
| Triple-effect evaporator, 2 t/h evaporation | 700-900 kg/h | Continuous |
| CIP set, 3 m3 at 80 °C | 250-400 kg/h | Short, scheduled cycles |
| Stenter frame, 8 chambers | 600-1,200 kg/h | Steady, sensitive to pressure |
| Paper machine dryers, per 10 t/d output | 400-600 kg/h | Continuous, 24 hours |
Step two: correct for feedwater temperature
Catalogues normally state capacity as equivalent evaporation from and at 100 °C, which assumes feedwater already at 100 °C. Real feedwater arrives at 20 °C from a cold tank or at 105 °C from a deaerator, and the difference changes the fuel-side duty without changing the steam rating. The correction is modest but should be stated: for the same heat input, capacity with 105 °C feedwater is roughly 95 percent of the from-and-at figure, and about 90 percent with cold feed. A 10 t/h boiler fed at 20 °C is therefore closer to a 9 t/h machine in service, which is one reason plants that skip the deaerator also complain about short capacity.
Step three: handle peaks and diversity
Peak demand sizes the boiler; average demand sets the fuel bill. Record the 15-minute maximum, not the hourly average, because a batch plant can double its draw for a quarter of an hour. Where several machines are installed, apply a diversity factor rather than summing nameplates: eight dyeing machines rarely reach 130 °C in the same minute, and a factor of 0.7 to 0.85 is typical. Then add margin for fouling, future load and control stability, normally 15 to 25 percent.
Worked example: a plant measures 5.8 t/h average, 8.4 t/h at the 15-minute peak, and a diversity-adjusted simultaneous peak of 7.6 t/h. With 20 percent margin the required output is 9.1 t/h, so a 10 t/h boiler is selected. Its minimum stable load of 25 to 30 percent still covers the night shift, when demand falls to 2.2 t/h.
Step four: check pressure, temperature and turndown
Capacity alone does not define a boiler. Design pressure must exceed the highest user requirement plus header losses, commonly 10 bar(g) for 8 bar process steam. Superheat is only needed when a process or a turbine demands it, and adding it unnecessarily raises cost and complicates operation. Turndown matters more than most buyers expect: a 10 t/h boiler that cannot hold below 3 t/h will cycle, and each cycle costs purge losses, extra blowdown and thermal stress on the shell.
Data to collect before requesting a quotation
- Maximum, average and minimum steam demand in kg/h, with the daily and weekly profile
- Working and design pressure in bar(g), saturated or superheated
- Feedwater temperature and whether a deaerator is planned
- Fuel type, lower calorific value and available supply pressure
- Operating hours per year and expected load factor
- Floor area, headroom and the access route for the largest section
XBOILER COMPANY sizes shell and water-tube boilers from exactly this data set. Our engineers specify the rating, the burner turndown and the feedwater package together, because a capacity number detached from the load profile is the most common cause of an oversized boiler and a disappointing fuel bill.