


System type: Three Pass Steam Boiler for Textile Industrial. Boiler fuel: natural gas, LPG, diesel, gasoline, heavy oil, etc. System features: saving fuel costs in the Sugar industry, high degree of automation and environmental protection. Boiler application: Cane sugar, white granulated sugar, brown sugar, candy factory, jelly sugar, etc.
- Capacity and fuel type tailored to your process
- Export documentation and commissioning support
- Spare parts and after-sales service
Specification
| System type | Three Pass Steam Boiler for Textile Industrial. |
|---|---|
| Boiler fuel | natural gas, LPG, diesel, gasoline, heavy oil, etc. |
| System features | saving fuel costs in the Sugar industry, high degree of automation and environmental protection. |
| Boiler application | Cane sugar, white granulated sugar, brown sugar, candy factory, jelly sugar, etc. |
| Efficiency | ≥ 92–98% depending on fuel, model and load |
| Control | PLC / automatic; remote monitoring optional |
| Documentation | General arrangement drawing, material certificates, O&M manual |
| Lead time | 20–45 days after drawing approval |
| Warranty | 12–60 months depending on scope |
Specifications can be customised. Contact us for full technical data and drawings.
Applications
- Food and beverage industry
- Palm oil mills and biomass processing
- Textile, rubber and plastics
- Chemical, pharmaceutical and paper
Description
XBOILER Product Advantages
![]() |
Intelligent Oil Steam Boiler Control System
XBOILER offers a tailored boiler control system for fire tube steam boilers, providing flexible and precise operation. The system is customized to suit local furnace workers’ needs, and with advancing technology, it delivers increasingly intelligent and efficient boiler management. |
![]() |
Advanced Oil/Gas Steam Boiler Burner System
Equipped with world-renowned burners from brands like Riello and UNIGAS, XBOILER boilers ensure optimal fuel combustion tailored to your factory’s production demands. A smaller flame maintains boiler temperature during low steam requirements, minimizing fuel loss from furnace chamber purging during startup. |
![]() |
Compact Three-Pass Steam Boiler Design
The three-pass fire tube steam boiler features a compact structure, occupying less space than other boiler types. Its densely arranged fire tubes enable faster heating, making it ideal for the food industry’s production needs. |
![]() |
Specialized Boiler Solutions for the Sugar Industry
XBOILER provides comprehensive technical support for every boiler user, with over a decade of expertise in designing boiler solutions for the sugar industry. Thousands of companies rely on XBOILER systems, which are tailored to factory production requirements and backed by exceptional after-sales service for optimal operation. |
![]() |
Enhanced Three-Pass Boiler for the Textile Industry
Building on the three-pass boiler structure, XBOILER improves flue gas flow from direct to vortex type, enabling the boiler water to absorb heat from high-temperature flue gas more efficiently. This upgrade allows the same boiler capacity to operate with less fuel, meeting the textile industry’s demands effectively. |
Technical Parameters
Find the capacity of the coal fired steam boiler you want and check other parameters of the boiler as a reference.


Compared with other options
Typical differences between XBOILER equipment and a general-market alternative.
| Feature | XBOILER | General market |
|---|---|---|
| Build & inspection | Zhengzhou boiler manufacturing base, third-party inspection on every unit | Pure trading company, no engineering team |
| Efficiency on site | Optimised combustion, low excess air, tested at commissioning | Nameplate figure only |
| Documentation | Drawings, material certificates, O&M manual | Limited or on request |
| After-sales | Spare parts and engineer support, remote diagnosis | Varies, often no local stock |
| Customisation | Fuel, pressure, voltage and layout adapted | Fixed catalogue models |
Further reading
Questions
Can the capacity be customised?
Yes. Capacity, pressure and fuel are matched to your process requirements.
What is the delivery time?
Typically 30-60 working days after drawing approval.
Is installation included?
We provide installation supervision, commissioning and operator training.
Request a Quotation
Send us your data and our technical team will prepare a proposal for your requirements.







