






The XBOILER Multi Tube Dust Collector is a cyclone-type dry dust remover designed for boiler and industrial dust collection. Utilizing centrifugal force, it captures dust on the tube walls, allowing it to settle into the collection chamber via gravity. It effectively traps dust particles ranging from 5-10 μm.
- Capacity and fuel type tailored to your process
- Export documentation and commissioning support
- Spare parts and after-sales service
Specification
| Capacity | Quoted per project requirement |
|---|---|
| Fuel | Biomass / gas / oil / coal |
| Working pressure | 1.0–2.5 MPa |
| Application | Industrial process steam or hot water |
| Efficiency | ≥ 92–98% depending on fuel, model and load |
| Control | PLC / automatic; remote monitoring optional |
| Documentation | General arrangement drawing, material certificates, O&M manual |
| Lead time | 20–45 days after drawing approval |
| Warranty | 12–60 months depending on scope |
Specifications can be customised. Contact us for full technical data and drawings.
Applications
- Food and beverage industry
- Palm oil mills and biomass processing
- Textile, rubber and plastics
- Chemical, pharmaceutical and paper
Description
System Diagram

- The XBOILER Multi Tube Dust Collector is a cyclone-type dry dust remover designed for boiler and industrial dust collection. Using centrifugal force, it captures dust on the tube walls, which then settles into the collection chamber by gravity, effectively trapping 5-10 μm dust particles.
- Constructed from wear-resistant cast iron, the XBOILER multi-tube cyclone offers high dust removal efficiency and substantial gas processing capacity, making it ideal for dust collection in various solid fuel boilers.
- Featuring an explosion-proof safety design with a large-area bursting disc, it provides corrosion resistance and prevents clogging. The explosion-proof valve is engineered to effectively mitigate safety risks.
- With an innovative design, the XBOILER dust collector ensures high dust removal efficiency while maintaining a compact structure and smaller footprint.
- A trusted brand with over 35 years of experience, XBOILER products come with multiple quality certifications, a 1-year warranty, and 24-hour online after-sales support.
Compared with other options
Typical differences between XBOILER equipment and a general-market alternative.
| Feature | XBOILER | General market |
|---|---|---|
| Build & inspection | Zhengzhou boiler manufacturing base, third-party inspection on every unit | Pure trading company, no engineering team |
| Efficiency on site | Optimised combustion, low excess air, tested at commissioning | Nameplate figure only |
| Documentation | Drawings, material certificates, O&M manual | Limited or on request |
| After-sales | Spare parts and engineer support, remote diagnosis | Varies, often no local stock |
| Customisation | Fuel, pressure, voltage and layout adapted | Fixed catalogue models |
Further reading
Questions
Can the capacity be customised?
Yes. Capacity, pressure and fuel are matched to your process requirements.
What is the delivery time?
Typically 30-60 working days after drawing approval.
Is installation included?
We provide installation supervision, commissioning and operator training.
Request a Quotation
Send us your data and our technical team will prepare a proposal for your requirements.


